Fixing Time-Outs and Long-Running ABAP Reports
April 4, 2019

Slow ABAP reports and TIME_OUT runtime errors are a common source of frustration for SAP users, and the culprit is usually a custom Z program. This paper explains why reports slow down over time and the techniques that fix the majority of performance problems.
Key Takeaways
- Most long-running reports are custom ABAP programs that were never optimized or have been modified many times
- Raising the time-out limit is a temporary fix: the report will time out again as the database grows
- Database access is almost always the main issue: optimize data retrieval and avoid nested SELECT statements
- Use SE30 and the SE38 Extended Program Check and Code Inspector to find the bottlenecks
- Sometimes the best answer is a rewrite, a split into separate reports, or a different tool such as a BW cube
The Dreaded TIME_OUT Error
Reports that used to take seconds now take minutes, and a much-anticipated month-end report that used to chug away for a while instead returns the dreaded "ABAP Runtime Error", with TIME_OUT and "Time limit exceeded". It's a common scenario for many SAP customers.
More often than not, the culprit is a custom-written ABAP program: the giveaway is the "Z" at the start of the program name.
Common Causes of Long-Running Programs
- The ABAP program was not properly optimized. It may run quickly at first, but slows down over the years as the volume of data grows.
- A report started out simple, but modification after modification over the years turned it into a "Frankenstein" report that strays far from what the original was designed to do.
- Reports designed years ago may have been coded without optimization functionality available in more recent versions of SAP. Optimizations are often possible after SAP upgrades.
Why Not Just Allow Longer Run Times?
One way to stop a report timing out is to ask your Basis team to change system parameters to allow longer run times. This might get the report running again for a while, but it's not a permanent solution. We don't recommend it: the report is sure to time out again as the database grows, and longer run times can degrade system performance.
Solutions
Fixing a report's performance takes some ABAP expertise, and the solution depends on the underlying cause and the program's specific logic. These tips and techniques fix the majority of problems:
Analyze with SE30
This standard SAP transaction analyzes the report's performance and shows you where the bottlenecks are. The Extended Program Check and Code Inspector in SE38 can also help identify optimization issues.
Optimize database access
In the vast majority of cases (practically all the time, in our experience), the main issue is database access and retrieval of information. Optimize the database retrieval methods and stay away from nested SELECT statements.
Split Frankenstein reports
Consider splitting an overgrown report into several separate reports. A column or extra subtotal used by only one person might be dragging down performance for everyone.
Add database indexes
New database indexes can significantly improve report runtimes, with a trade-off of increased overhead.
Consider a complete rewrite
As unappealing as it sounds, it can take less time to start again from scratch than to decipher pages of twisted logic in a legacy report modified by generations of ABAP developers who are no longer with the company.
Use the right tool for the job
Maybe that ABAP report should really be a BW cube, or be generated through a data analytics tool such as SAP Analytics Cloud.
How CONTAX Can Help
Fixing a slow or timing-out report takes ABAP expertise and a close look at the program's logic. Learn more about our ABAP development services or contact us.
Related Articles

What's Next for SAP Business ByDesign Customers?
SAP has stopped selling Business ByDesign to new customers. Here's what that means if you run it today, and your options for what comes next.

Why SAP Business One Customers Should Consider Moving to Acumatica
SAP Business One has served growing companies well for years. Here's why Acumatica Cloud ERP is worth a look as you plan your next ERP decision.

Wayne Safety Upgrades Operations and Warehouse with Acumatica and CONTAX
Wayne Safety replaced its 30-year-old DOS-based ERP with Acumatica Cloud ERP, implemented by CONTAX, and went live a month early with 35%+ better order management and a 5-day faster close.
